Permit Fast-Tracking

FASTRACK CANCELLED
Due to COVID-19 Fastracking of permits is cancelled until further notice.
We appreciate your cooperation and patience.


Overview

Permit fast-tracking is a "while you wait" permitting process for residential accessory structures, additions and renovations (decks, sheds, etc.).

Availability

Wednesdays
8:30 am to Noon

Eligibility

The following permit applications are NOT eligible for fast-tracking:

  • Permit applications that require grading permits
  • Permit applications to resolve code violations
  • Permit applications where the property is located in the Critical Area
  • Commercial building permit applications
  • Permit applications for pools
  • Permit applications for basement renovations
  • Permit applications for additions or alterations to existing homes that result in increased total enclosed living space or wastewater flow

How to Fast-Track a Permit

Step One: Home owners association approval or town approval, when applicable

If the property is located within the Town of Chesapeake Beach, the Town of North Beach or a private community, such as Chesapeake Ranch Estates, Drum Point, White Sands, etc., a stamp of approval from that community will be required as a part of the permit package submittal. It is the responsibility of the applicant to receive these approvals prior to proceeding to step two.

These approvals are not a part of the Inspections & Permits Fast-Track process.

Step Two: Processing

Submit the permit application and all required attachments to the Inspections & Permits office for processing.

Step Three: Review

After the complete building permit package is processed by the Inspections & Permits Division it will be forwarded to the applicable review agencies for review and approval.

Permits for the Town of Chesapeake Beach and the Town of North Beach do not require Calvert County Department of Planning & Zoning review, however pre-approval from the town is required prior to submittal (Step One).

Permit applications with grading exemption applications will be forwarded to the Engineering Division for review prior to Calvert County Soil Conservation District review.

Step Four: Payment

Pay all applicable fees, excise taxes and bonds after approval by all applicable reviewing agencies.

Step Five: Issuance of permit

After all applicable payments are received the Inspections & Permits Division will process the permit for approval and issuance.

Notes About Permits

  • The official building permit must be posted conspicuously at the front of the lot.
  • Separate permits are required for projects that include plumbing and electrical work.
  • Inspections shall be requested in the normal course as required by the acknowledgement of conditions of approval signed by the applicant at time of payment. Depending on construction methods and sequence, additional inspections may be required.
  • The accessory structure, addition, and/or renovation shall not be occupied or used until all building, grading, electrical and plumbing final inspections are completed and approved.